References
We would like to give you an impression of our range of services based on a few project descriptions.


REFERENCES
  • Eurogate Module 2
    • Project: Eurogate Module 2
      Customer:   Depenbrock Bau GmbH & Co. KG, Stemwede
      Location:   Hamburg Freeport
      Order volume:   110.000 EUR
      Working period:   August 2007 to February 2008
      Services:   687 m lowering of ground water using a flushing filter system

      Supply, installation and operation of a ground-water treatment plant for 40 m³/h, consisting of deferrization, desorption and filtration of water using active carbon
  • Compacter Station Achim
    • Project: Compacter Station Achim
      Customer:   I-Bau Behringen GmbH, Bispingen
      Location:   Achim near Bremen
      Order volume:   210.000 EUR
      Working period:   November 2007 to approx. May 2009
      Services:   Water retention at various individual construction excavations using flushing filter systems

      Installation of a seepage system consisting of 235 flushing filters

      Supply, installation and operation of a ground-water treatment plant for 160 m³/h for deferrization of the seepage water
  • Spring exploration, Army Training
    Ground, Altmark
    • Project: Spring exploration, Army Training Ground Altmark
      Customer:   State Construction Office, Sachsen-Anhalt, Stendal
      Location:   Hütten/Planken near Haldensleben
      Order volume:   360.000 EUR
      Working period:   September 2007 to October 2008
      Services:   Conducting a long-term pump trial on a total of 10 supply wells with a max. of 50 m³/h

      Supply, installation and operation of a ground-water treatment plant for 50 m³/h, consisting of desorption and deferrization
      Power supply via 3 emergency power generation sets
      PLC control of the well pumps and treatment plant with remote monitoring
  • Eldena Lock
    • Project: Eldena Lock
      Customer:   H.F. Wiebe GmbH & Co. KG, Achim
      Location:   Eldena, Müritz-Elde-Waterway
      Order volume:   40.000 EUR
      Working period:   December 2007 to April 2008
      Services:   Provision of
      10 water retention wells and
      2 ground-water measuring points down to 17 m depth

      Operation of water retention during lock modification
  • Hochbahn Hamburg, Underground
    Line U4
    • Project: Hochbahn Hamburg, Underground Line U4
      Customer:   Eggers Umwelttechnik GmbH, Hamburg
      Location:   Hamburg, Harbour City
      Order volume:   440.000 EUR
      Working period:   November 2007 to April 2009
      Services:   Provision of
      30 water retention wells down to
      42 m depth,
      20 ground-water measuring points down to 50 m depth,
      12 seepage wells down to 30 m depth

      Laying of 780 m of pressure piping, 225 diam. HDPE